Rogz Control Long Lead Black

$53.99

Select

SKU: HLLOC25A Category: Tag:

Description

The Rogz Control Long Lead in Black provides a versatile and robust solution for pet owners needing enhanced control during walks, accommodating medium to large dogs with ease. Features Durable webbing ensures lasting use Reflective stitching increases visibility in low light Corrosion-resistant zinc snap hook guarantees secure attachment In-built waste bag holder for convenience while walking Accessory D-ring perfect for clipping on ID tags or other essentials Specifications Length options – 1.2 meters or 1.4 meters for versatility Width – 25 mm perfectly suitable for a secure grip Material – High-strength nylon webbing for maximum durability Color – Classic Black matching any style Pet Suitability & Product Care Designed for medium to large dog breeds Regular inspection advised to ensure ongoing safety Always supervise your pet during use for added security Easy to clean: simply wipe the lead with a damp cloth and check regularly for signs of wear About the Brand Rogz stands at the forefront of pet innovation, consistently delivering high-quality, ergonomic, and fashionable pet accessories designed to meet the evolving needs of pets and their owners. Embodied in each Rogz Control Long Lead is the commitment to your pets wellbeing and your own peace of mind, ensuring every walk is a safe and enjoyable experience.